Marking up and drilling LH pannel +2.5 hours = 17.5 hours

As ever, things arent as easy as expected!

Knowing it wasnt exactly going to be “big lego” but had a fair bit of fiddling to get the LH panel right.

As i half expected the holes for the bushes needed a little openning up to line up – the bigger headache was getting the predrilled holes to line up with the chassis struts.  Required some minute adjustment to get the lineing up at the back, then at the front too.

clamped down the panels with gclamps and some little grippy things, did the job though.

drilled through, now need to clean up the holes, and get some more panels drilled and lined up too.

Post a comment or leave a trackback: Trackback URL.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: